Bag counts for the slab sizes people pour most, at three thicknesses.

A 10 × 10 ft slab 4 inches thick needs 1.36 cubic yards with 10% extra, which is 62 bags of 80 lb concrete (each yields about 0.6 ft³). A 60 lb bag yields 0.45 ft³ and a 40 lb bag 0.30 ft³.

Concrete bag chart

Bags of concrete by slab size
SlabThickCubic yards (+10%)80 lb bags60 lb bags
4 × 4 ft4 in0.221014
4 × 4 ft5 in0.271317
4 × 4 ft6 in0.331520
8 × 8 ft4 in0.874053
8 × 8 ft5 in1.094966
8 × 8 ft6 in1.305979
10 × 10 ft4 in1.366282
10 × 10 ft5 in1.7077102
10 × 10 ft6 in2.0492123
10 × 12 ft4 in1.637498
10 × 12 ft5 in2.0492123
10 × 12 ft6 in2.44110147
12 × 12 ft4 in1.9688118
12 × 12 ft5 in2.44110147
12 × 12 ft6 in2.93132176
12 × 20 ft4 in3.26147196
12 × 20 ft5 in4.07184245
12 × 20 ft6 in4.89220294
20 × 20 ft4 in5.43245326
20 × 20 ft5 in6.79306408
20 × 20 ft6 in8.15367489
24 × 24 ft4 in7.82352470
24 × 24 ft5 in9.78440587
24 × 24 ft6 in11.73528704

The formula

Cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12 Add 10% for spillage and uneven ground Bags = cubic feet ÷ bag yield (80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³), rounded up

Bag yields are the manufacturers’ published figures for standard concrete mix. High-strength and fast-setting mixes yield slightly less per bag; check the bag.

Past roughly a cubic yard, ready-mix delivery usually beats bags on price and labor. See bags vs ready-mix, or use the concrete calculator with your own size.

Typical 2026 US prices used in the tables: 80 lb concrete $6.50, ready-mix $170/yd³ plus a $150 short-load fee under 4 yd³; gravel $5.50 per 0.5 ft³ bag or $45/ton + $100 delivery; mulch $4 per 2 ft³ bag or $40/yd³ + $75 delivery; topsoil $3.25 per 0.75 ft³ bag or $35/yd³ + $75 delivery. Change any of them in the calculators.

FAQ

How many 80 lb bags of concrete make a yard?

About 45. A cubic yard is 27 cubic feet and an 80 lb bag yields about 0.6 cubic feet, so 27 ÷ 0.6 = 45 bags.

How many 60 lb bags make a yard?

About 60 (27 ÷ 0.45 cubic feet).

Should I add extra?

Yes. Add 5–10% for spillage, uneven subgrade and form bowing. The chart includes 10%.