How much gravel for a driveway?

Tons for common driveway sizes, at a top-up depth and a full new-driveway depth.

A 50 × 10 ft driveway at 4 inches needs about 9.5 tons of gravel with 10% extra; at 6 inches it needs 14.3 tons. For a new driveway, plan 6–8 inches in layers: large base stone, then #57 stone, then a finer top layer.

Gravel for a driveway
DrivewayYd³ at 4 inTons at 4 inTons at 6 inDelivered cost at 6 in
20 × 10 ft2.73.85.7$370
30 × 10 ft4.15.78.6$505
50 × 10 ft6.89.514.3$752
50 × 12 ft8.211.417.1$888
75 × 12 ft12.217.125.7$1,270
100 × 12 ft16.322.834.2$1,652
150 × 12 ft24.434.251.3$2,418

Typical 2026 US prices used in the tables: 80 lb concrete $6.50, ready-mix $170/yd³ plus a $150 short-load fee under 4 yd³; gravel $5.50 per 0.5 ft³ bag or $45/ton + $100 delivery; mulch $4 per 2 ft³ bag or $40/yd³ + $75 delivery; topsoil $3.25 per 0.75 ft³ bag or $35/yd³ + $75 delivery. Change any of them in the calculators.

Layering a new gravel driveway

  1. Base (4 in): #3 or #4 stone (1.5–3 in), compacted.
  2. Middle (2–3 in): #57 stone (¾–1 in).
  3. Top (2 in): crusher run or #411 (stone plus fines) that packs hard.

Add a woven geotextile fabric on soft soil. Add one gravel calculator area per layer, each with its own depth.